EXCERPT FROM REFERENCES
Pulp and paper
 |
|
Norske Skog, Skien (Norway)
Relocation of a newsprint paper production
line from Norway to Brazil
Complete mechanical and electrical dismantling of the paper machine PM 7 including marking, documentation, packing, logistic handling as well as shipment to Brazil. |
 |
|
Norske Skog, Skien/Honefoss (Norway) Relocation of a TMP plant
Dismantling in Skien (Norway): Complete dismantling of a TMP-plant including marking, documentation, packing as well as the complete logistic handling.
Re-installation in Honefoss (Norway): Complete mechanical and electrical re-installation of the TMP-plant. |
 |
|
Mondi Packaging, Frantschach (Austria)
Main rebuild of PM 8 and PM 6
Replacement of the entire machine drive, replacement of the gears in the gear boxes, replacement of the entire recirculating oil lubrication system as well as replacement of the Clupak-cylinder.
Rebuild/new installation of the steam and condensate system of PM 6 and PM 8
Rebuild/new installation of the complete steam and condensate system of the drier section of the PM 8, installation of the measure and control system as well as the impulse pipes. Dismantling and new installation of the steam joints of the PM 6 as well as installation of the measure and control system and the impulse pipes.
Revision of PM 6 and PM 7
Refurbishment of the HP hoods 1 and 2, manufacture and installation of new brackets, adjustment and replacement of the pneumatic adjusting cylinders as well as check and replacement of cardan joints at the drives of wet section and drier section.
Boiler revision
Revision of the bark boiler, revision of the electric filter at CK II, CK III, the bark boiler and the lime kiln, revision of the evaporation plant as well as revision of CK II and CK III. |
 |
|
Sappi Ehingen, Ehingen (Germany)
Main rebuild of the production line PM 6/ SM 6
Project "Geminus"
Main rebuild of the production line PM 6 / SM 6 during a main shut down period of not even one month. In peak times, FMT coordinated up to 320 fitters on the site.
|
 |
|
Saica, Zaragoza (Spain)
Installation of the new paper machine PM 10
Complete installation of the new production line PM 10 from headbox to pope reel as well as installation of the slitter winder including optimisation works and start-up assistance.
|
 |
|
SCA Aschaffenburg (Germany)
Main rebuild of the paper machine PM 1
Dismantling of the existing paper machine PM 1. Re-installation of the new paper machine consisting of headbox, former, pulper, drier section, speed-sizer, hydraulic and pneumatic control system, lubrication systems including all aggregates as well as the base plates. Rebuild of the pope-reel. Electrical/C&I installation. This main rebuild was realised within only 42 days! In peak times, FMT coordinated about 165 fitters on the site.
|
 |
|
Mondi Ltd., Merebank (South Africa)
Main rebuild of the paper machine PM 31
Dismantling of the existing paper machine PM 31. New erection of the new paper machine consisting of former, press section, drier section, speed-sizer, calender, drier hood and pope reel. Piping of the hydraulic and pneumatic control system and the central oil lubrication system.
|
 |
|
Pulp Mill Stendal, Arneburg (Germany)
Complete Erection of the Stendal Pulp Mill
Lead Management of the consortium AFI, technical leadership
1. Overall project coordination and administration
Lead management of the consortium AFI (project director) | Site management and technical leadership | Warehousing | Monthly progress follow up | Monthly update of time schedule | Doc-control and distribution | Coordination of the FMT subcontractors
2. Installation works
Installation of all the mechanical equipment | Installation of steelstructures (4.500 tons of platforms, pipe racks and building structures) | Tank insulations (60.000 m² of insulation) | Installation of all the electrical equipment (950 MCC’s, VDF’s and transformers) | Installation of the instrumentation (> 2.000 hook ups) | Grouting (non shrinking and concrete) | Refractory work lime kiln (800 tons) | Acid proof tile lining works | Painting of tanks and steelstructures | Concrete lining of tanks
Manpower AFI in peak times: > 1.800
Manpower FMT in peak times: ~ 500
|
 |
|
Stora Enso Maxau, Karlsruhe (Germany)
Replacement / Main rebuild of the production line PM 6
Complete dismantling of the existing paper machine and complete re-installation of the PM 6. Modification of the VariTop slitter winder. Erection of the pre-piping. In peak times, FMT coordinated about 220 fitters on the site. |
 |
|
Paper Mill Palm, Woerth (Germany)
Installation of the production line PM 6
Project "Rio Grande"
Complete mechanical erection of the new production line PM 6, mainly consisting of stock preparation, constant part, vacuum system, paper machine, 2 slitter winders, roll conveying system, auxiliary equipment, hydraulic and pneumatic control system, control system and central lubrication system. Electrical/C&I installation of stock preparation, constant part, slitter winder, steam and condensate system including supply of material and manufacture of the control cabinets. Manpower in peak times: about 200 skilled FMT fitters.
|
 |
|
m-real, Äänekoski (Finland)
Main rebuild of the board machine BM 1
Dismantling of the existing board machine from wire section and complete erection of the new BM 1. Piping of the hydraulic and pneumatic control system, the central oil and grease lubrication system as well as installation of the machine-oriented control and instrumentation systems. |
 |
|
SCA Graphic Laakirchen, Laakirchen (Austria)
Complete erection of the production line PM 11 Convertible
Technical and commercial leadership of the consortium FISK
Due to the extent and complexity of the project, the complete erection was carried out under integration of consortium partners. FMT was responsible for the technical and commercial leadership as well as for the safety coordination of the consortium FISK, which sybolises the companies behind the consortium: FMT (responsible for paper machine, ventilation system, hydraulic system, central lubrication system, auxiliary equipment, technological steel structure), Integral (process piping), Siemens (Industrial processing electrical services, building electrical services, instrumentation) and Kremsmüller (calender, slitter winder, process piping, inuslation). Manpower in peak times: about 600 skilled fitters of consortium FISK.
|
|