EXCERPT FROM REFERENCES
Plant servicing
|
Lenzing AG Lenzing (AT) |
Routine repair and maintenance Routine repair and maintenance works at the boiler plant and the auxiliary plant, economizers, reheaters, superheaters, membrane walls, headers, HP-pipes. |
|
|
ENBW Kraftwerke AG CHP Heilbronn (DE) |
Routine boiler maintenance Routine boiler maintenance at superheaters, headers, flue gas ducts, catalysts, economizers and air preheaters. |
|
|
Mondi Packaging Frantschach (AT) |
Routine repair and maintenance Routine repair and maintenance works at the boiler plant and the auxiliary plant, economizers, reheaters, superheaters, membrane walls, headers, HP-pipes, valves, fans, dampers and flue gas ducts. Annual main revision Annual main revision in the course of the plant shutdown with up to 150 specialists. |
|
|
UPM Steyrermühl Steyrermühl (AT) |
Vertical sorter Replacement of the bearing unit including repair in the FMT workshop. |
|
|
AVE Wels (AT) |
Routine inspection and repair Ongoing inspection workings inkluding repair and optimisation at the conveyors. |
|
|
Smurfit Nettingsdorfer Nettingsdorf (AT) |
SOKE 3 - Recovery boiler retrofit- turnkey erection Modernisation of a 720 tds/d recovery boiler; dismantling of a bi-drum boiler system (approx. 350 tons) and installation of a single-drum natural circulation system (approx. 400 tons). Rebuild during a plant shut down of 25 days. |
|
|
Sappi Austria Gratkorn (AT) |
Project "Tiger" Complete erection of a HRSG boiler with auxiliary firing including steel structures, piping, stack (height 75 m) behind gas turbine Siemens SGT-800 (42 MW). Boiler steam m.c.r. 165 t/h, 120 bar, 520°C |
|
|
voestalpine Stahl Donawitz (AT) |
Blast furnace gas fired boiler plant Turnkey installation of a boiler island with combined firing including steel structures, internal and external piping. Quantity: approx. 1775 tons installed; Boiler steam m.c.r. 230t/h, 129 bar, 545°C |