EXCERPT FROM REFERENCES

Energy and environment


CCPP Pont sur Sambre, Pont sur Sambre (France)
Combined Cycle Power Plant (Single-Shaft, 412 MW)
Electrical/C&I installation for gas turbine, generator, steam turbine and auxiliary equipment. Medium voltage cabling. Installation of the main transformer, the auxiliary transformer and the medium voltage switchgears. Installation of the diesel standby set and battery cells. Installation of the aluminium generator bus duct.


CCPP Timelkam, Timelkam (Austria)
Combined Cycle Power Plant (Single-Shaft, 400 MW)
Mechanical installation of a steam turbine (HIP+LP) including condenser, a gas turbine and a generator (Single-Shaft-Design). Installation of the internatl pipes and the sound enclosures well as turbine insulation.


CHP Öresundsverket, Malmö (Sweden)
Combined Cycle Power Plant (Multi-Shaft, 400 MW)
Mechanical and electrical/C&I installation of a steam turbine (HIP+LP) including generator and condenser (hot box), a gas turbine including generator, turbine piping, installation of the sound enclosures and auxiliary equipment as well as insulation.


CCPP Livorno, Livorno Ferraris (Italy)
Combined Cycle Power Plant (Multi-Shaft, 800 MW)
Mechanical and electrical/C&I installation of a steam turbine (HIP+LP) including generator and condenser (hot box), 2 gas turbines including generator, gas turbine piping, installation of the sound enclosures and auxiliary equipment as well as insulation.


CCPP Kårstø, Tysværvåg (Norway)
Combined Cycle Power Plant (Single-Shaft, 418 MW)
Mechanical and electrical / C&I installation for a steam turbine (HIP+LP) including generator and condenser, a gas turbine including generator, gas turbine piping, installation of the sound enclosures, the fire fighting system and auxiliary equipment as well as insulation.


CCPP Herdecke, Huerth (Germany)
Combined Cycle Power Plant (Multi-Shaft, 400 MW)
Mechanical installation of a steam turbine (HIP+LP) including generator and condenser, a gas turbine including generator as well as installation of the sound enclosures and insulation.


CCPP Knapsack, Knapsack (Germany)
Combined Cycle Power Plant (Multi-Shaft, 800 MW)
Mechanical installation of a steam turbine (HIP+LP) including generator and condenser, two gas turbines including generator as well as installation of the sound enclosures and insulation.
CCPP Sagunto
Sagunto (ES)
CCPP Sagunto, Sagunto (Spain)
Combined Cycle Power Plant (3 x Single-Shaft, 1200 MW)
Electrical/C&I installation for gas turbine, generator, steam turbine and auxiliary equipment. Medium voltage cabling. Installation of the main transformer, the auxiliary transformer and the medium voltage switchgears. Installation of the diesel standby set and battery cells. Installation of the aluminium generator bus duct. Testing and start-up.


BASF, Antwerpen (Belgium)
Combined Cycle Power Plant (Single-Shaft, 400 MW)
Electrical/C&I installation: Installation of the main transformer, the auxiliary transformer and the medium voltage switchgears including laying and termination of cables. Installation of the diesel standby set and battery cells. Installation of the generator bus duct.


CCPP Palos de la Frontera (Spain)
Combined Cycle Power Plant (Single-Shaft, 3 x 380 MW)
Mechanical erection of a 3-stage steam turbine and generator of 3 units single shaft sets. Also including the installation of condenser, generator piping, insulation, sound enclosurres and accessory equipment. Electrical / C & I installation and control system for the entire power plant. Also installation of bus duct, transformers, switch gears and commissioning phase A.


Coolkeeragh CCGT, Londonderry (Northern Ireland)
Combined Cycle Power Plant (Multi-Shaft, 400 MW)
Mechanical installation of a 3-stage steam turbine (150 MW) including generator, condenser, piping, spray insulation and accessory equipment. Mechanical installation of a GE gas turbine (250 MW) type Frame 9 FA (dual fuel supply), generator, piping, air inlet channel, exhaust-gas diffusor and filter house. Electrical/C&I installation of the steam turbine, the gas turbine and the filter house.


West Offaly Power Station, Shannonbridge (Ireland)
Steam turbine plant (Single-Shaft, 150 MW)
Mechanical erection of a FUJI steam turbine (HIP and LP), generator, condenser, accessory equipment, piping, sound enclosure as well as spray insulation.


CCPP Campo de Gibraltar, San Roque (Spain)
Combined Cycle Power Plant (Single-Shaft, 2 x 375 MW)
Mechanical and electrical/C&I installation of two single shaft turbine sets (power rate per unit 375 MW) consisting of a 3-stage steam turbine, generator and gas turbine type V94.3A including condenser, piping, insulation and accessory equipment. Electrical/C&I installation: Installation of cable trays, cable laying and connection as well as installation of control cabinets.