EXCERPT FROM REFERENCES

Electrical and instrumentation systems
CCPP Pont sur Sambre
Pont sur Sambre (France)
Combined Cycle Power Plant (Single-Shaft, 412 MW)
Electrical/C&I installation for gas turbine, generator, steam turbine
and auxiliary equipment. Medium voltage cabling. Installation of the
main transformer, the auxiliary transformer and the medium voltage
switchgears. Installation of the diesel standby set and battery cells.
Installation of the aluminium generator bus duct.
CCPP Kårstø
Tysværvåg (NO)
Combined Cycle Power Plant (Single-Shaft, 418 MW)
Electrical/C&I installation for a CCP plant. Installation of the switch
gear, main transformer, the auxiliary transformer and the medium
voltage switch gears. Installation of the diesel standby set and
battery cells. Installation of the aluminium generator bus duct.
Installation of the entire lighting for turbine hall, boiler and the
outside facilities.
CCPP Sagunto
Sagunto (ES)
Combined Cycle Power Plant (3x Single-Shaft, 1200 MW)
Electrical/C&I installation for gas turbine, generator, steam turbine
and auxiliary equipment. Medium voltage cabling. Installation of the
main transformer, the auxiliary transformer and the medium voltage
switchgears. Installation of the diesel standby set and battery cells.
Installation of the aluminium generator bus duct. Testing and start-up.
SCA Hygiene Products
Mannheim (DE)
Project “Snowflake”
Selection of C&I field devices, electrical/C&I planning, mean
voltage switch gear, low-voltage main distribution cabinet,
MCC switch gear, electrical/C&I installation, lighting, cabling of
the telephone system, fire alarm system, climatisation of the
control rooms, cold test and start-up assistance in the range of
the erection of the new bleaching plant.
FGD Cottam PS
Retford (GB)
Flue gas purification plant
Electrical installation of the flue gas purification plant, unit 1.
XXX-Lutz
Sattledt (AT)
High-bay storage
- Manufacture of the MCC-cabinets and control cabinets
- E/C&I installation, cold test and warm test and site coordination
CCPP Sagunto
Sagunto (ES)
Ventilation system for CCP plant
Electrical/C&I installation of the ventilation system for three
generating units (400 MW) of a combined cycle power plant.
Hilti AG
Nendeln (LI)
Logistic Centre
Manufacture of control cabinets, electrical installation, cold test
and functional test for a logistic centre.
Teich AG
Weinburg (AT)
Roller plant
Electrical installation of plant components including supply of
material for the new roller plant II.
TenCate Geosynthetics
Linz (AT)
Spunbonding line
Increase of capacity of the spunbonding line 1. Engineering of
the entire electrical/C&I plant including manufacture of the
control cabinets, software applications for PLC system,
electrical/C&I installation, start-up and documentation.
SCA
Aschaffenburg (DE)
Main rebuild of the paper machine PM 1
Electrical/C&I installation including cold test in the course of the
main rebuild of the paper machine PM 1.
Steelworks Carinox
Charleroi (BE)
Stainless steel works
Electrical installation of a stainless steel works constisting of:
compensation plant (33kV), electrical/C&I installation, lighting
as well as installation of heating system, climate control system
and ventilation system.
Papierfabrik Palm
Woerth (DE)
Paper machine PM 6
Electrical/C&I installation of partitons like stock preparation,
constant part, slitter winder, steam and condensate system
including supply of material and manufacture of control cabinets
in the course of the new erection of the paper machine PM 6.